Dearne Fire Station Chiller Replacement
Përshkrimi
The project comprises the complete design verification, supply, installation, testing, commissioning and handover of a new permanent air-cooled chiller system serving Dearne Community Fire Station located at S63 5DN.
The works are to provide reliable cooling provision to the existing building systems following a prolonged history of underperformance and failure of the legacy heating/cooling plant.
The new installation shall be designed, installed and commissioned as a complete operational system, subject to a detailed contractor site survey and independent validation of the actual cooling loads and existing system condition.
The contract works are to take place January 2027 (date by mutual agreement with the contract manager.)
Klasifikimi
Bashkohuni me Heelky për t'u lidhur, për të punësuar dhe për t'u rritur
Krijoni një llogari falas për t'u shkruar njerëzve, për të aplikuar për punë dhe për të postuar misione.
Bashkohu tani — është falas