Raindale Beck Weir Removal
תיאור
A contract for the full removal of Raindale beck weir. Forestry England has commissioned feasibility work which identified the removal of the weir as the preferred option to improve the ecological condition and connectivity of Raindale Beck. The project forms part of Forestry England's wider programme of river restoration and nature recovery works within the public forest estate. Forestry England now wishes to appoint a suitably qualified and experienced Contractor to undertake the detailed design, obtain all necessary consents and permissions, and carry out the removal of the weir and associated restoration works. The initial design and survey works need to be completed by 31st March 2027. The fully consented and permitted final design works must be completed by the 31st July 2027. The construction works need to be completed by 31st December 2027
סיווג
להצטרף ל-Heelky כדי ליצור קשרים, לגייס ולצמוח
צרו חשבון חינמי כדי לשלוח הודעות, להגיש מועמדות למשרות ולפרסם משימות.
להצטרפות — בחינם