Brown's Field Community Centre boiler and BMS replacement

Cambridge City Council
締め切り
2027年1月8日12:00 (UTC)
場所
Cambridge, UKH12, イギリス
タイプ
Works
Procedure
Below threshold - open competition
発行済み
2026年11月26日
View and apply on Find a Tender
This notice comes from public procurement data. Heelky is not the buyer: questions, documents and applications go through the official notice.

説明

The Brown's Field Community Centre has a TREND IQ246 BMS, gas boiler for heating, gas boiler for heating and extract ventilation systems that all need to be assessed and repaired/replaced.
1. BMS replacement will be based on an Trend IQ5x controller and retain the majority of controls equipment already installed on site, upgrading what is required to ensure the system can operate as required. All components of the system will be commissioned at the end of the project and demonstrated as commissioned to a Cambridge City Council representative. The existing IQ246 will be returned to Cambridge City Council.
2. Provide a panel-mounted touchscreen display (HMI) IQVIEWx-SCD for the Trend BMS to enable local plant room monitoring and control of the BMS.
3. The existing gas boiler and associated equipment not necessary to complete the project will be decommissioned and removed from site. An appropriate ASHP for connection to the existing four under floor heating manifolds will be installed and have the capability to provide cooling in a future project. All components of the system will be commissioned at the end of the project and demonstrated as commissioned to a Cambridge City Council representative. The under-floor heating will be controlled by the new Trend BMS system.
4. The existing domestic hot water boiler and associated equipment not necessary to complete the project will be decommissioned and removed from site. Instantaneous water heaters (and dedicated electrical circuit) will be supplied to 10 rooms and domestic hot water flow and return pipework will as far as reasonably practicable be removed from the building.
5. Extract ventilation will be tested, repaired where possible, and where they cannot be repaired extract fans will be replaced with equivalent duty extract fan units that are capable of BMS integration.
6. THERMAL STORAGE CYLINDER OPTION: The additional option of a thermal storage cylinder should be proposed to allow generation of heating during off peak hours for use during the day.
7. DESIGN INFORMATION: Brown's Field Community Centre plantroom is approximately 10m away from the site boundary with residential neighbours just beyond. The ASHP system chosen will need to satisfy all noise restrictions both at commissioning and for the units' serviceable life of up to 20 years (assuming annual servicing and repairs completed).

分類

CPV 45331000CPV 45333000
Source: Find a Tender · Licence: Open Government Licence v3.0 · Original notice · Retrieved 2026年11月29日

Heelky に参加して、つながり、採用し、成長しましょう

無料アカウントを作成して、メッセージの送信、求人への応募、ミッションの掲載を始めましょう。

今すぐ参加 — 無料です

言語を選択

Heelky はあなたの選択を記憶します。

その他の言語

利用できる言語:70 Heelky の言語について