Public tenders
World Bank · Request for Expression of Interest

Consulting Services for the Development of the Methodology for the Elaboration of the Interactive Map on Seismic Risk in the Republic of Moldova

Office for External Assistance Programs Management
Рок
2. Децембар 2026. 00:00 (UTC)
Где
Moldova, Молдавија
Врста
Consulting
Procedure
Quality And Cost-Based Selection
Објављено
4. Новембар 2026.
View and apply on World Bank
This notice comes from public procurement data. Heelky is not the buyer: questions, documents and applications go through the official notice.

Опис

REQUEST FOR EXPRESSIONS OF INTEREST

(CONSULTING SERVICES – FIRMS SELECTION)

Republic of Moldova

Strengthening Moldova’s Disaster Risk Management and Resilience Project

Loan No.: 9720-MD

Assignment Title: Consulting Services for the Development of the Methodology for the Elaboration of the Interactive Map on Seismic Risk in the Republic of Moldova

Reference No. (as per Procurement Plan): MD-OEAPM-578962-CS-QCBS

The Government of the Republic of Moldova has received financing from the World Bank toward the cost of the Strengthening Moldova’s Disaster Risk Management and Resilience Project, and intends to apply part of the proceeds for consulting services.

The consulting services (“the Services”) include the Development of the Methodology for the Elaboration of the Interactive Map on Seismic Risk in the Republic of Moldova.

The Terms of Reference (TOR) for the primary procurement stage for the assignment are attached to this request for expressions of interest.

The Ministry of Infrastructure and Regional Development (MIRD) and the P.I. “Office for External Assistance Programs Management” (OEAPM) Project Implementation Unit (PIU) now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:

• At least 5 years of experience in developing a technically sound seismic risk methodology, data architecture, indicators, GIS-ready outputs and functional specification for the interactive map.

Only the firm’s relevant experience and qualifications will be assessed at the shortlisting stage. Key Experts are not required to be proposed and will not be evaluated at this stage.

The shortlist will contain five (5) to eight (8) firms.

The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers” September 2023 (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest.

Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.

A Consultant will be selected in accordance with the Quality and Cost-based Selection method described in the Procurement Regulations and to be specifically set out in the Request for Proposals.

Further information can be obtained at the address below during office hours 08:30 to 17:30 hours.

Expressions of interest must be delivered in a written form to the address below (by e-mail) by 17:30 local time, December 2, 2026.

Attn: Ms. Raia CANTEMIR

Director, Office for External Assistance Programs Management / PIU

57/1 Mitropolitul Banulescu Bodoni str., office 306, MD-2005, Chisinau, Republic of Moldova

Tel: 373 22 23 29 63, 373 23 82 48

E-mail: achizitii.proiecte@ogpae.gov.md

www.ogpae.gov.md

TERMS OF REFERENCE

for Consulting Services for the Development of the Methodology for the Elaboration of the Interactive Map on Seismic Risk in the Republic of Moldova

Contents

1. Background and Rationale. 4

1.1. Conceptual scope of the interactive seismic risk map. 4

1.2. Boundaries of this assignment 5

1.3. Justification and need. 6

1.4. Legal and regulatory framework. 6

2. Objective of the Assignment 7

2.1. Intended use of outputs and end users. 8

3. Scope of Services. 9

3.1. Review of the existing legal, policy, normative and technical framework. 9

3.2. Review of seismic risk methodology, models and relevant international practice. 10

3.3. Data inventory and data architecture for hazard, exposure, vulnerability and ancillary data. 11

3.4. Development of seismic risk calculation model and scenarios. 12

3.5. Exposure and vulnerability modelling rules. 13

3.6. Definition of risk indicators, derived indicators and threshold intervals. 14

3.7. Functional specification for the Interactive Seismic Risk Map 15

3.8. Methodology piloting, validation and use-case testing. 16

3.9. Technical workshops, consultations and revision based on comments. 17

3.10. Final methodology, interactive map package and handover documentation. 18

3.11. Implementation roadmap, data management and sustainability. 18

3.12. Cross-ToR coordination, Common Data Standard and procurement packaging. 19

3.13. Buildings-focused seismic resilience strategic framework. 20

4. Quality Assurance and Technical Requirements. 21

4.1. Methodological consistency, scientific traceability and reproducibility. 21

4.2. Compatibility with the hazard methodology, RVS, NCM framework and QAP. 22

4.3. Data, GIS, metadata and digital package requirements. 22

4.4. Risk model verification, uncertainty treatment and sensitivity checks. 23

4.5. Functional specification quality requirements and UAT readiness. 23

4.6. Internal QA/QC, peer-review, registers and controlled revisions. 23

4.7. Acceptance of deliverables by the Beneficiary. 24

5. Deliverables and Timeline. 25

6. Reporting and Format of Deliverables. 26

6.1. Language of deliverables, reporting process and final submission package. 26

6.2. Required formats: DOCX, PDF, XLSX/CSV, GIS files, maps, metadata, calculation annexes and editable files. 27

7. Key Qualification Requirements. 27

7.1. Key Expert 1 - Team Leader / Senior Seismic Risk Methodology Specialist 28

7.2. Key Expert 2 - Exposure, Vulnerability and Seismic Risk Modelling Specialist 28

7.3. Key Expert 3 - GIS, Spatial Data and Data Architecture Specialist 29

7.4. Mandatory non-key expert — IT / Web-GIS Functional Specification and Demonstrator Specialist 30

7.5. Non-Key Experts / Support Experts. 30

8. Client's Inputs and Institutional Coordination. 31

8.1. Available documents. 31

8.2. Coordination with MIRD and OEAPM/PIU.. 31

8.3. Access to available data. 31

8.4. Comments on deliverables. 32

8.5. Technical meetings and consultations. 32

9. Evaluation of Technical and Financial Proposals. 32

9.1. Technical Evaluation Criteria. 33

9.2. Financial Evaluation. 36

9.3. Combined Evaluation. 37

9.4. Award Criterion. 37

• Background and Rationale

The Government of the Republic of Moldova is implementing the Strengthening Moldova's Disaster Risk Management and Resilience Project (SMORE), financed by the World Bank. The Project aims to strengthen national preparedness and resilience to natural hazards and climate-related shocks, including through improved policy, regulatory and technical instruments for disaster risk reduction.

This assignment is part of Subcomponent 3.1 - which includes technical assistance for the development of methodologies, regulatory documents, data systems and supporting tools aimed at reducing seismic risk in the Republic of Moldova. Within this framework, the methodology for the elaboration of the Interactive Map on Seismic Risk is required as a core technical product linking seismic hazard, exposure and vulnerability information into a coherent and usable risk assessment framework.

The Republic of Moldova is exposed to significant seismic hazard, primarily generated by the Vrancea intermediate-depth seismic source (Romania), which has historically affected the entire territory of the country. The 1940 (M 7.4) and 1977 (M 7.2) earthquakes underlined the vulnerability of the existing building stock and the importance of integrated risk assessment for prioritization of public investment, retrofit planning and emergency preparedness. In this context, an interactive seismic risk map — built on an explicit and reproducible methodology — is a foundational instrument for evidence-based seismic risk management.

•

• Conceptual scope of the interactive seismic risk map

Object of the risk assessment. This Terms of Reference addresses the seismic risk of buildings. The primary risk objects of the methodology and of the interactive map are buildings — residential, public and other categories agreed with the Client — consistent with the PAD, with the RVS methodology under GD 334/2025 (Activity 1b) and with the retrofit feasibility studies under Activity 1d. Critical facilities and infrastructure may be represented as contextual/ancillary layers for interpretation and prioritization (e.g. location of hospitals, schools, emergency services), but the full seismic risk modelling of infrastructure networks (utilities, transport, lifelines) is outside the scope of this assignment, because it requires component-specific fragility models and network data that are not available in the Republic of Moldova and are not covered by the Subcomponent 3.1 data chain

The interactive seismic risk map is not, by design, a mere visualization product. It is the visible output of a structured technical process that must define: the data architecture, the calculation logic, the risk indicators and their thresholds, the treatment of uncertainties, the scenarios to be assessed, and the rules for presenting results in a transparent, auditable and reproducible manner. The map shall enable public authorities, technical experts and decision makers to identify where seismic risk is concentrated, which factors drive that risk, and how alternative assumptions or scenarios affect the outcome.

The assignment is closely coupled with the other outputs of Subcomponent 3.1, in particular: (i) the methodology for seismic hazard zoning developed under Activity 1a, which provides the hazard input layer; (ii) the Rapid Visual Screening (RVS) methodology operationalized through Activity 1b, which provides the building-level exposure and vulnerability data; (iii) the future regulatory NCM package harmonized with Eurocode 8; and (iv) the seismic risk reduction recommendations to be developed under subsequent project activities. The methodology for the interactive risk map shall therefore be designed to be coherent with hazard, exposure and fragility/vulnerability datasets, compatible with GIS-based workflows, and suitable for integration into institutional planning and regulatory-support activities, applying the Common Data Standard and the coordination mechanism defined in Section 3.12.

•

• Boundaries of this assignment

Methodology — not software development. This assignment is preparatory and methodological in nature. It explicitly covers the development of the seismic risk methodology for buildings, the data architecture, the calculation model, indicators and thresholds, the functional specification for the interactive map, and (where feasible within available data) a methodological pilot or demonstrator. It does not include full-scale software/web-GIS development, deployment of a production IT platform, code production, hosting infrastructure, large-scale data acquisition, or final population of the interactive map with the complete national dataset, all of which are foreseen as subsequent activities to be procured under separate contracts.

Accordingly, the critical quality risk under this assignment is not the coding of an interactive web-GIS application, but the correct translation of seismic risk principles, hazard-exposure-fragility/vulnerability integration logic, indicator structure, threshold classification and GIS data architecture into a complete, internally coherent and procurement-ready specification. Where a pilot or demonstrator is included, it shall serve only to test and validate the methodology — not to substitute the future production interactive map system.

In line with the principle of fit-for-purpose expertise, the Key Experts required under this Terms of Reference shall be focused on seismic risk methodology, exposure and fragility/vulnerability modelling, structural and earthquake engineering, and GIS / spatial-data architecture. Given the role of the pilot/demonstrator and of the functional specification, an IT / Web-GIS specialist shall additionally be included in the team as a mandatory non-key expert (Section 7.4), assessed on a responsive basis;IT or web-GIS development input may be mobilized as non-key or short-term support, including through subcontracting or through qualified members of the Consultant's technical team with proven experience in interactive mapping or web-GIS configuration.

This Terms of Reference also includes, as a secondary and framework-level output built on the seismic risk map results, a buildings-focused seismic resilience strategic framework (Section 3.13). This framework is deliberately limited to the building sector and to the strategic (policy and prioritization) level; it is not a full standalone National Seismic Risk Reduction Strategy. The broader themes of institutional arrangements, emergency response, reconstruction planning, financing mechanisms and public communication are identified as follow-on activities rather than developed under this assignment.

•

• Justification and need

The Republic of Moldova currently lacks an integrated, methodologically harmonized and publicly accessible seismic risk mapping framework. Existing seismic hazard maps, building data and disaster risk information are fragmented across institutional sources, are not structured around a common data architecture, and are not yet integrated into a transparent risk-calculation framework usable for policy, investment and emergency preparedness decisions. A robust, traceable and reproducible methodology for the elaboration of an Interactive Seismic Risk Map is therefore a precondition for:

• the integration of the seismic hazard zoning developed under Activity 1a with the exposure and vulnerability data collected through the RVS process under Activity 1b;
• the prioritization of public buildings and critical infrastructure for detailed seismic assessment, retrofit feasibility studies and public-investment decisions;
• the alignment of national practice with recognized international risk-mapping frameworks (GEM, UNDRR, JRC, INFORM Risk, Risk Data Library and equivalent);
• evidence-based decision making for seismic risk reduction at central, regional and local government levels;
• transparent, auditable communication of risk to non-specialist audiences while preserving scientific rigour;
• the preparation of a defensible, technology-neutral procurement of any future interactive map development service, in line with World Bank Procurement Regulations.

• Legal and regulatory framework

The services to be carried out under this Terms of Reference shall comply with, but not be limited to, the following legal and regulatory references:

• Code of Urbanism and Construction No. 434/2023 (Codul Urbanismului i Construciilor) and subsequent implementing acts;
• Government Decision No. 334 of 05.06.2025 on the Regulation for Rapid Visual Screening (RVS) of existing buildings;
• NCM A.07.02 — Quality assurance in design and execution of constructions;
• EN 1998-1:2004 + A1:2013 — Eurocode 8: Design of structures for earthquake resistance — Part 1: General rules, seismic actions and rules for buildings;
• EN 1998-3:2005 — Eurocode 8 — Part 3: Assessment and retrofitting of buildings;
• ISO 19115 — Geographic information — Metadata; INSPIRE Directive principles for spatial-data interoperability;
• OGC standards for web-GIS services (WMS, WFS, WMTS) — to be referenced where relevant for the functional specification;
• Law No. 133/2011 on the protection of personal data, with subsequent amendments;
• Law No. 271/1994 on civil protection, and the institutional framework for emergency management in the Republic of Moldova;
• Reference international frameworks: GEM (Global Earthquake Model) risk methodology, UNDRR/UNISDR risk terminology, JRC INFORM Risk Index, Sendai Framework for Disaster Risk Reduction 2015–2030;
• Recent Romanian national methodology for the development of seismic risk maps and related Ro-Risk outputs (reference regional practice for Vrancea-type intermediate-depth seismicity);
• World Bank Procurement Regulations for IPF Borrowers (current edition);
• World Bank Environmental and Social Framework (ESF) — relevant Environmental and Social Standards;
• Quality Assurance Plan (QAP) of Subcomponent 3.1 — current approved version.

• Objective of the Assignment

The general objective of the assignment is to develop a complete and technically justified methodology for the elaboration of the Interactive Map on Seismic Risk of buildings for the Republic of Moldova, including the conceptual model, data architecture, calculation approach, indicators, threshold intervals, GIS/data requirements and functional specification necessary for practical implementation.

The assignment shall establish how seismic risk is calculated, documented and communicated by combining the three fundamental components of seismic risk: hazard, exposure and fragility/vulnerability. The Consultant shall define the required input data, minimum attributes, spatial units, assumptions, formulas, risk scenarios, uncertainty treatment, classification logic and outputs to be used for the interactive map.

The specific objective is to produce a methodology that can be used by MIRD, OEAPM/PIU, technical reviewers, consultants, public authorities and other designated users as a reliable reference for seismic risk mapping, prioritization and decision support. The methodology shall not be limited to a narrative description; it shall provide practical rules, tables, matrices, data templates and calculation logic that allow the results to be verified and reproduced.

The assignment shall also produce the functional specification for the Interactive Seismic Risk Map. This specification shall describe required layers, filters, tools, comparison of results and scenarios, import/export functions, reporting functions, access modes, performance expectations, scalability, security, auditability and update mechanisms. This shall be prepared as a technical bridge between the seismic risk methodology and any future or parallel IT/web-GIS implementation.

In addition, and building on the outputs above, the assignment shall produce a concise, buildings-focused seismic resilience strategic framework (Section 3.13). Drawing on the seismic risk map methodology and its results, this framework shall set out protection objectives and target safety/performance levels for the retrofitting of existing buildings and for the design of new construction, the use of risk information for building-code (NCM/EC8) implementation, retrofit prioritization for public and critical-use buildings, broader building-stock risk-reduction goals, and a strategic (portfolio-level) cost-benefit perspective to support investment prioritization. Consistent with the PAD (recommendations for integrated interventions), this remains a framework-level output and does not constitute a full standalone national strategy.

The assignment is primarily a seismic risk methodology, data architecture and GIS specification assignment. It is not intended to be a complex software development contract. Any IT/web-GIS support required for functional specification, configuration of a simple demonstrator, or preparation of handover materials shall be provided through the mandatory non-key IT/Web-GIS expert (Section 7.4) and, if needed, additional non-key support, while the core responsibility remains with seismic risk, exposure/vulnerability and GIS/data experts.

The final product shall include the written methodology, calculation model description, data architecture, risk indicators and thresholds, technical workshop records, functional map specification, GIS-ready data structures, metadata templates, QA/QC registers and, where feasible within available data, a pilot or demonstrator map package in study areas decided by the Client (pilot area: municipality of Chi

Класификација

WB-PROJECT P504278
Source: World Bank · Licence: CC BY 4.0 · Original notice · Retrieved 29. Новембар 2026.

Придружите се Heelky да се повежете, запослите и растете

Направите бесплатан налог да поручујете људима, пријављујете се на послове и објављујете мисије.

Придружите се — бесплатно је

Изаберите језик

Heelky ће запамтити ваш избор.

Остали језици

Доступни језици: 70 О језицима на Heelky-ју