Public tenders
EU Funding & Tenders portal · Call for proposals (forthcoming)

Integrated Approaches for Retrofitting Infrastructures with Innovative Energy Storage Technologies

European Commission
Prazo final
1 de dezembro de 2027 às 00:00 (UTC)
Onde
European Union
Tipo
Funding call
EU contribution per project
7.500.000 EUR
Procedure
HORIZON Innovation Actions
Publicado
29 de novembro de 2026
View and apply on EU Funding & Tenders portal
This notice comes from public procurement data. Heelky is not the buyer: questions, documents and applications go through the official notice.

Descrição

Expected Outcome:

Project results are expected to contribute to all the following expected outcomes:

• Improved energy security of the energy system by offering cost-effective and efficient solutions for additional diverse and flexible energy storage capacities.
• Improve the sustainability and circularity of energy storage systems.
• Enhanced economic viability of energy storage by utilizing existing infrastructures.

Scope:

Demonstration of novel or improved technological solutions for cost-efficient, circular and sustainable energy storage, which contribute to grid flexibility and make use of existing obsolete or outdated energy or other infrastructures. Proposals should integrate the synergies between novel or improved energy storage technologies and retrofitting of obsolete or outdated infrastructures, like e.g. old hydropower dams and basins, decommissioned power plants, former industrial facilities, coal mines, fossil fuel infrastructure etc. by optimizing at the same time storage capacity and efficiency as well as circularity and socioeconomic and environmental sustainability, which should be addressed, e.g. by stakeholder outreach and consideration of possible environmental impacts. Furthermore, proposals should follow secure by design approach and integrate built-in security in the energy systems.

Selected projects are expected to contribute to the BRIDGE initiative[1] and actively participate in its activities.

Technology Readiness Level - Technology readiness level expected from completed projects

Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL.

[1] https://bridge-smart-grid-storage-systems-digital-projects.ec.europa.eu/

Classificação

EU-CALL HORIZON-CL5-2027-07
Source: EU Funding & Tenders portal · Licence: EU reuse policy (Decision 2011/833/EU) · Original notice · Retrieved 29 de novembro de 2026

Entre no Heelky para se conectar, contratar e crescer

Crie uma conta gratuita para enviar mensagens, candidatar-se a vagas e publicar missões.

Cadastre-se — é grátis

Escolha seu idioma

O Heelky vai lembrar sua escolha.

Outros idiomas

Idiomas disponíveis: 70 Sobre os idiomas no Heelky