Integrating circularity in LCA-based modelling frameworks for renovation of buildings (Built4People Partnership)

European Commission
Sperdatum
Sept. 15, 2027, middernag (UTC)
Waar
European Union
Tipe
Funding call
EU contribution per project
6750000 EUR
Procedure
HORIZON Innovation Actions
Gepubliseer
Nov. 29, 2026
View and apply on EU Funding & Tenders portal
This notice comes from public procurement data. Heelky is not the buyer: questions, documents and applications go through the official notice.

Beskrywing

Expected Outcome:

Project results are expected to contribute to all of the following expected outcomes:

• Demonstration of measurable reductions in material flows, life cycle energy use and GHG emissions in building renovations that integrate circularity strategies to contribute to achieving net-zero whole life carbon buildings;
• More robust approach to current modelling frameworks to comprehensively reflect the complexity of circularity strategies in life cycle assessments at building scale.

Scope:

European buildings are increasingly adopting circularity strategies in renovations to reduce life cycle environmental impacts and improve resource efficiency in response to the requirements based on current frameworks, such as Level(s) and WLC models used by Member States based and EN 15978 standard. The complexity of these circularity strategies, such as material reuse and recycling, and addressing the changing nature of assessed systems with long life cycles are critical for achieving more reliable assessment results. Further work is needed to advance and achieve more detailed modelling frameworks that integrate circularity assessment with life cycle assessment, supporting the delivery of net-zero whole-life carbon buildings.

Proposals should address all of the following:

• Develop a comprehensive modelling framework that integrates circularity assessment in life cycle, covering cradle to cradle system boundary;
• Apply the developed modelling framework to at least three real-life buildings in different climatic regions in different Member States or Associated Countries, for which renovation project developers have adopted ambitious circularity strategies to achieve zero whole-life carbon buildings. Circularity strategies should include reuse and/or recycle, as well as at least one of the following: reduce, repair, refurbish, remanufacture, and repurpose;
• Assess the embodied emissions (from materials, products, and construction processes) and operational emissions (from energy use for HVAC, DHW, electrical appliances, lighting) of the real-life buildings subjected to renovations during their entire life cycle, referencing life cycle stages in EN 15978.

This topic implements the co-programmed European Partnership on ‘People-centric sustainable built environment’ (Built4People). As such, projects resulting from this topic will be expected to contribute to the objectives of Built4People, transfer knowledge to its network of innovation clusters[1] and report on results in support of the monitoring of the Built4People KPIs.

Technology Readiness Level - Technology readiness level expected from completed projects

Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL.

[1] https://built4people.eu/b4pic_network/

Klassifikasie

EU-CALL HORIZON-CL5-2027-05
Source: EU Funding & Tenders portal · Licence: EU reuse policy (Decision 2011/833/EU) · Original notice · Retrieved Nov. 29, 2026

Sluit by Heelky aan om te verbind, aan te stel en te groei

Skep 'n gratis rekening om mense boodskappe te stuur, vir poste aansoek te doen en missies te plaas.

Sluit nou aan — dit is gratis

Kies jou taal

Heelky sal jou keuse onthou.

Ander tale

Beskikbare tale: 70 Oor tale op Heelky