Thornton Le Dale Public Toilet internal Refurbishment
شرح
The appointed contractor will be responsible for managing and delivering the works in their entirety, including all necessary labour, materials, plant, equipment, site management, health and safety arrangements, waste disposal and making good upon completion.
The contractor must ensure that the works are undertaken safely, efficiently and with appropriate consideration for the surrounding environment and the continued operation of the wider Thornton-le-Dale visitor facilities.
The Authority is seeking a high-quality, durable and practical finish, with materials and fittings selected to withstand the demands of a busy public toilet facility and minimise ongoing maintenance requirements.
All works must be completed in accordance with the tender specification, relevant statutory requirements and applicable building and safety standards.
طبقهبندی
برای ارتباط، استخدام و رشد به Heelky بپیوندید
حساب رایگان بسازید تا به افراد پیام دهید، برای شغل درخواست دهید و مأموریت بگذارید.
اکنون بپیوندید — رایگان است