Public tenders
World Bank · Request for Expression of Interest

CAPEX management agent

Ministry of Transport- Iraqi Republic Railways
Spriocdháta
Noll. 7, 2026, meán oíche (UTC)
Cá háit
Iraq, an Iaráic
Cineál
Consulting
Procedure
Quality And Cost-Based Selection
Foilsithe
22 Samhain 2026
View and apply on World Bank
This notice comes from public procurement data. Heelky is not the buyer: questions, documents and applications go through the official notice.

Cur síos

Re-lunch Request for Expressions of Interest

(Consulting Services Firms selection)

Consultancy Services of Management Agent CAPEX

Country Republic of Iraq

Project Iraq Railways Extension and Modernization Project (P507282)

Assignment Title Consultancy Services of Management Agent CAPEX

Reference No. IREM-MOT-MA-CS01

The Republic of Iraq has applied for financing from The World Bank toward the cost of the Iraq Railways Extension and Modernization Project (P507282 and intends to apply part of the proceeds toward Consulting Services.

The consulting services (“the Services”) include management support to IRR to carry out the Project, including:

• Establish effective Project management and control procedures by establishing the cost and schedule baseline and the reporting pro-form as for all components under the IREM Project.

• Review and comment with dedicated project teams and submit to IRR management for approval of projects’ documentation at every stage in each project delivery value chain—procurement, construction, and commissioning.

• Collect progress-related data and report projects’ progress to IRR Management.

• Develop, monitor, and manage IRR’s overall risk profile arising from the implementation of concurrent projects under the IREM Project.

• Coordinate management of concurrent projects and resolve any resourcing conflict between different project teams.

• Understand and interpret projects’ status and implications to determine whether the IRR Board requires authorization for any deviations from the agreed-upon project targets.

• Support for the reviewing the outputs of component 2 of IREM Project (studies, transaction advisory for mobilizing private sector resources) and manage E&S risks in all phases of their implementation (elaboration of ToRs, procurement procedures, contracting, evaluation of interim and final reports of the various consultants, etc.).

• Develop a training and development program for the IRR Projects’ staff in management of CAPEX projects.

• It is foreseen that the duration of the overall service will last for 5 years.

The expected date for starting the assignment is May 2027.

The Terms of Reference (TOR) for the primary procurement stage for the assignment are attached to this request for expressions of interest.

The Iraq Republic Railway Company (IRR) now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:

1. General qualifications: Details of the company’s organization, core business, and years in business, relevant experience in railway infrastructure development, management of CAPEX projects, and technical and managerial capability of the firm to deliver the assignment.

2. Experience in similar assignments: having substantially completed in the last 10 years at least one similar large assignment of value not less than US$7.5 million. The similarity of the assignment shall be based on the following criteria:

i. Establishment and operation of a traditional Project Management Office in support of railway infrastructure development, such as railway signaling modernization, track construction, and upgrades, or similar railway infrastructure development work, and

ii. Engineering, procurement, supervision of construction, and commissioning of railway infrastructure development, such as railway signaling modernization, track construction, and upgrades, or similar railway infrastructure development work

3. Experience in The World Bank Procurement Procedures in at least one project in railway infrastructure or in another infrastructure development project.

4. Experience in implementing or supporting the implementation of Environmental and Social action plans

5. A completed on-the-job training and capacity development program for client staff in the same project or in any other infrastructure development project.

6. Financial soundness: To demonstrate its financial soundness, the firm is required to submit audited financial statements for at last three years (2023-25).

7. Joint Venture Requirements:

i. The number of members in a Joint Venture should not exceed three

ii. In the case of a Joint Venture, their combined capacity to demonstrate the requirements for Project Management of railway infrastructure development will be considered.

iii. Each member of Joint Venture should demonstrate its experience in the project management function of an infrastructure project

iv. In the case of a Joint Venture, each member of the Joint Venture is required to provide its financial statements.

Key Experts will not be evaluated at the shortlisting stage.

The shortlist will contain 5 to 8 firms.

The attention of interested Consultants is drawn to Section III, paragraphs,3.13, 3.15, 3.16 and 3.17 of “The World Bank Procurement Regulations for IPF Borrowers,” 7th edition, dated September 2025 (“Procurement Regulations”), setting forth The World Bank’s policy on conflict of interest.

Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. In addition, please refer to the following specific information on conflict of interest related to this assignment: the selection process requires that Consultants or their affiliates, competing for a Consulting assignment do not derive a competitive advantage from having provided Consulting Services related to this assignment.

Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.

A Consultant will be selected in accordance with the Quality and Cost Based Selection (QCBS) method set out in the Procurement Regulations and to be specifically set out in the Request for Proposals.

Further information can be obtained at the address below during office hours 09:00 to 14:00 Baghdad time.

Expressions of interest must be delivered in a written form in person, or by e-mail to the address below by Monday, December 07, 2026.

Attention: Mr. Wajdi Salih

Position: Procurement manager

Address: Baghdad Railway Central Station Building, Damascus Square, 1st floor, Project Management Team (PMT) office

City: Baghdad

Country: Republic of Iraq

Mobile: +964(0)7730 135 309

e-mail: world-bank@scr.gov.iq

Terms of Reference (ToR) – IRR Management Agent

1. Background

1.1 Railway sector in Iraq

The performance of Iraq’s transport sector is essential for the efficient movement of goods and people. However, faced with almost four decades of conflict, neglect, and underinvestment, the sector is unable to provide valuable services to the industry and the residents of Iraq.

Even though the transport sector contributes 9% to Iraq's GDP, the sector suffers from inadequate maintenance and the government's inability to fund and operate aging infrastructure, leading to widespread deterioration. This has negatively impacted national and regional connectivity, economic growth, and traffic safety, while limiting private financing opportunities. Inefficiencies in public sector governance and SOE performance, as well as SOE indebtedness, have led to a weak transport and logistics performance, high private sector costs, and barriers to entry. In addition, weak sector governance and chronic underfunding impede the sector's growth and improvement. The Government of Iraq is fully committed to enhancing the efficiency of the railway transport sector and to increasing the transport market share of railways.

In May 2023, Iraq launched the Iraq Development Road Initiative, which aims to leverage its strategic geographical location for regional trade connectivity. This road and rail corridor is an integral part of Iraq’s development strategy, and it will connect Al Faw Grand Port on the Gulf to Europe via Iraq and Türkiye. GoI plans to develop the initiative in two stages: the first stage involves extending and modernizing the existing railway network and creating new connections from Al-Faw Seaport to the Türkiye border. The second stage will develop a 1,200 km greenfield railway link from Al-Faw Grand Port to the Türkiye border at an estimated cost of US$ 17 billion.

Institutionally, the current allocation of roles shows a number of stakeholders with an interest in the railway sector:

• The Ministry of Planning (MoP) oversees investment policy.

• The Ministry of Transportation (MoT) regulates transport policy.

• The Ministry of Finance (MoF) regulates budgeting an fiscal policy.

• Operational control of railways, ports, and airports falls under state-owned enterprises (SOEs) reporting to the MoT. Accordingly, the Iraqi Republic Railways (IRR) Company, an SOE under the MoT, is responsible for railway operations.

1.2 Iraqi Railways

Iraq’s railway network, 2,272 kilometers of standard gauge track and 115 stations, is currently in disrepair and offers limited transport connectivity. The network includes two main lines: one running north-south from Basra to the Syrian border at Rabiya, and another east-west from Baghdad to near the Syrian border at Akashat. Additionally, there is a transverse line from Kirkuk to Haqliaba and several short branch lines. Services are limited to a few freight lines, such as oil and grain transport, and passenger trains, including an overnight service from Baghdad to Basra and a weekly train to Sammara. Over the past year, Iraq has reactivated eight dormant rail lines, including the Baghdad to Al-Musayyib line and the Baiji field line. However, much of the track, including the lines that are BS90, is in poor condition, and the rail network's overall value to transport connectivity remains limited.

IRR is experiencing a considerable reduction in its transport volumes, and 2023 traffic data supports this trend:

• 2023 passenger volumes at 249,000 passengers represent a 53% drop against the passenger volume in 2018, when IRR recorded the highest passenger volumes, estimated at 529,000 passengers.

• Freight volumes of 66,000 tons represent a drop of 89% against the freight volume in 2021 when IRR recorded the highest freight volumes, estimated at 93,000 tons.

Overall, the infrastructure and rolling stock are in poor condition, with only 10-20% of the fleet available for use, and the signaling system has been destroyed. Operational safety is a growing concern due to reliance on voice messages, uncontrolled at-grade crossings, numerous encroachments to the right-of-way, and disrepair of the superstructure.

Financially, IRR depends heavily on the GoI's support for both operations and capital investment. Data for the period 2016 – 2020 shows that Government support was insufficient to cover IRR labour costs, which ranged between 67% and 82% of the company’s current expenses for the period. The workforce is aging and lacks modern railway operation skills. Despite these challenges, the railway system is beginning to transform, focusing on rehabilitating key links.

1.3 Railway modernization

The Government of Iraq has requested IBRD financing, including the assignment stipulated in this TOR, in order to improve the service quality and lower the carbon footprint of transport services between Umm Qasr Port in South Iraq and Mosul in North Iraq, and enhance regional connectivity. This Project is linked to the GoI’s plans for Stage 1 of the Development Road initiative. Stage 1 of this initiative comprises upgrading and modernizing the existing railway line Umm Qasr – Basra – Baghdad - Mosul (1,047 km) and constructing a new railway line from Shuaiba (Basra) to Al-Faw Grand Port in the south and from Mosul to the Türkiye border in the north. Annex 1 includes a location map. While the Development Road initiative is a long-term investment, the Project will enable Iraq to reap many of its benefits much sooner by carrying out rehabilitation and signal upgrades along the existing line.

The Project will enhance railway connectivity between the North and South of Iraq, thereby improving national connectivity. By upgrading and modernizing the existing railway infrastructure, the project will also facilitate the movement of goods and people, reduce transport costs, and improve travel times. This initiative is expected to position Iraq as a pivotal transit hub between East and West. Additionally, the project will create economic opportunities for youth and women, promote private sector participation (leading to a sustained growth in private sector jobs), and contribute to poverty reduction. The modernization efforts will also include the development of safety management systems and key performance indicators for the IRR, further strengthening institutional capacity and promoting sustainable economic growth.

The focus on upgrading the existing network, which will enable Iraq to maintain operations in the short term (for domestic and regional use). In the long term, the planned investments in the Development Road can continue as planned. The Project will enhance the performance of the existing brownfield North-South railway line (including enhancing safety at grade crossings). . As the market demand for larger volumes of transport increases, it will necessitate the dualization of specific railway segments, which will be addressed at a later stage (along with the greenfield railway link to Al-Faw Grand Port and to Türkiye).

The GoI and IRR are embarking on a major infrastructure modernization drive. The scale of the planned effort and the introduction of modern technology in the construction and operation of railway infrastructure make it the largest investment plan to be implemented in Iraq in the last 30-35 years. Neither the GoI nor IRR has suitable in-house or in-country experience that is required to deliver the planned investment scale and complexity. As a result, The World Bank offered to provide specialist external support.

2. Project description

The existing north-south railway line (built to a standard gauge of 1,435 mm) faces significant challenges in providing an adequate level of service. The overall track condition is poor, with a hardened track bed and the absence of a dedicated communication network and signal control system. IRR operations are further hampered by the very low availability of its ageing locomotive fleet. The average age of IR’s locomotive fleet is 42 years, and 68% of locomotives are older than 44 years. The average availability of IRR’s locomotives in 2020 was only 11%. Given the chronic shortage of maintenance funding in IRR, it is unlikely that the situation has improved since. These issues are compounded by constrained conditions in urban areas and numerous level crossings, further limiting the line's capacity. Notably:

• The southern section of the railway, linking Baghdad to the port of Umm Qasr (624 km), was partially rehabilitated in 2014. This included the installation of UIC-60 rail and the addition of a second track along a total of 50 km stretches, which modestly increased capacity. Despite these upgrades, passenger and freight trains currently operate at speeds of 80-100 km/h with an axle load limit of 25 tons. Certain segments of this rehabilitated section are experiencing accelerated deterioration, bringing the speeds down to 60km/h, the causes of which remain uninvestigated. The line’s overall transport capacity remains low, with minimal train services.

• The northern section of the railway extends about 520 km from Baghdad to Rabiaa, connecting to Syria, but lacking a direct link to Türkiye. Severely impacted by conflicts, the northern section operates at reduced speeds of 40-60 km/h, with some segments operating as low as 10 km/h. Axle load limits vary from 18 tons on the Mosul-Rabiaa section (using BS-75 rails) to 20 tons on the Baghdad-Mosul section (using BS-90A rails). Freight traffic on this line is limited, with irregular services arranged through ad-hoc contracting with commercial entities.

The recently signed Iraq Railway Extension and Modernisation Project (IREM) project will directly support Iraq's achievement of key development priorities set out in the country’s National Development Plan (NDP) 2024-2028. For the transport sector, the first objective of the NDP under railway is modernizing and developing the railway system and raising its operational capabilities to match those of Al-Faw Grand Port and the Development Road Project.

The IREM Project includes the following:

1. Component 1: Rehabilitation and Modernization of the Railway Infrastructure and Rolling Stock Maintenance Carrying out the restoration and rehabilitation of the single-track railway line from Umm Qasr Port to Mosul, through:

a. Sub-Component 1.1: Renewal of railway tracks of the north-south railway line from: (i) Al Yussifiya (Baghdad) to Baghdad; (ii) from Baghdad to Taji; (iii) from Taji to Baiji and from (iv) Baiji to Mosul;

b. Sub-Component 1.2: Spot rehabilitation of the railway line from: (i) Umm Qasr Port to Basra; and (ii) from Basra to Al Yussifiya (Baghdad);

c. Sub-Component 1.3:

i. Installation of railway signaling and ducts for optical fiber cables along the north-south railway line Umm Qasr – Basra – Baghdad – Mosul, including a safety level-crossing protection system for all official crossings along the alignment; and (ii) modernization of selected train stations;

ii. Rehabilitation of the maintenance workshop at Baiji and Samawa, including provision of rolling stock maintenance equipment; and

d. Sub-component 1.4: Provision of spare parts for the maintenance, operation, and safety of rolling stock.

2. Component 2: Railway Sector Institutional Reform

a. Sub-Component 2.1: Provision of technical support to the IRR to improve its institutional, operational, and financial performance, as well as its staffing plan, through, inter alia, (i) the identification and benchmarking of the IRR’s costs and revenue, (ii) the identification of the IRR’s assets and liabilities, (iii) the preparation of rolling business plans and provision of support to enable public service obligations contracts for delivery of passenger services, (iv) the preparation of an infrastructure contract between the IRR and the Borrower, and (v) the design of the infrastructure access charging regime for the operators’ use of the IRR’s railway infrastructure, all in accordance with the Railway Sector Reform Action Plan.

b. Sub-Component 2.2: Provision of technical support to the railway asset and safety management system of the IRR, through inter alia:

i. the development of a railway infrastructure asset management system (RIAMS) to enhance the IRR’s infrastructure management capabilities by: (A) identifying the infrastructure maintenance equipment needs and scope of modernization for the facilities that will house the new maintenance equipment; (B) identifying the infrastructure condition monitoring equipment needs; (C) recommending sustainable organizational arrangements for the maintenance function for infrastructure and rolling stock and managing identified climate risks; (D) preparing specifications for the RIAMS, including software development, (E) implementing the RIAMS, and (F) providing infrastructure condition monitoring of vehicles and equipment;

ii. the development of a rolling-stock asset management system, including the carrying out of a root cause analysis for rolling-stock deterioration and planning of rolling stock maintenance depots and f

Aicmiú

WB-PROJECT P507282
Source: World Bank · Licence: CC BY 4.0 · Original notice · Retrieved 29 Samhain 2026

Cláraigh le Heelky chun nascadh, fostú agus fás

Cruthaigh cuntas saor in aisce chun teachtaireachtaí a sheoladh chuig daoine, iarratas a dhéanamh ar phoist agus misin a phostáil.

Glac páirt anois — tá sé saor in aisce

Roghnaigh do theanga

Cuimhneoidh Heelky ar do rogha.

Teangacha eile

Teangacha ar fáil: 70 Faoi theangacha Heelky