Adiabatic Compressed Air Energy Storage (A-CAES) Demonstrator Plant
Aprašymas
Energy Coast West Cumbria Limited, trading as BEC, invites tenders for the design, manufacture and supply of a factory-integrated, modular Adiabatic Compressed Air Energy Storage (A-CAES) demonstrator plant for the BEST CAES project at Westlakes Science Park, West Cumbria.
The requirement comprises an above-ground, transportable system incorporating compression, thermal storage, expansion equipment, compressed-air storage vessels, power electronics and controls, together with specified testing, documentation, training and warranty support. Required performance includes 0.333 MW charging, 1.0 MW discharge and a minimum electrical round-trip efficiency of 80%.
The maximum contract budget is £1,600,000 excluding VAT, with operational handover required by 30 June 2028. Long-term paid maintenance and supplementary rapid-response hardware are excluded from this award. The procurement will follow an open procedure and is subject to funding, planning permissions and necessary approvals.
Klasifikacija
Prisijunkite prie Heelky, kad megztumėte ryšius, samdytumėte ir augtumėte
Sukurkite nemokamą paskyrą, kad rašytumėte žmonėms, teiktumėte paraiškas į darbus ir skelbtumėte misijas.
Prisijunkite dabar — tai nemokama